Svenska
English

Uddcomb Engineering makes nuclear power even cleaner also in Oskarshamn unit 1

Friday 19 September 2008

During the annual outage on unit 1 in Oskarshamn NPP, Uddcomb Engineering did once more install a hydrogen recombiner system. A similar project was performed on unit 2 earlier this summer. The already very limited release to the environment (less than 1% of the allowed level) is hereby further reduced. The installations where performed according to plan and the desired effect have been confirmed.

Back